Independent building expert

Expertise Construction defects

Common malpractice expertise

To identify and quantify defects

Have you had work done and the result does not match your expectations? Sealing defects, sloping finishes, non-compliance with specifications, poorly laid tiled, scalding paint, failed electrical installation... Malfaçons are common, and they are expensive if they are not noticed quickly.

The problem? Prove that this is a bad way, not an "aesthetic detail", as the entrepreneur often claims. Specify precisely the cost of repeats. Make a solid case to assert your rights, whether amicably or in court.

Our expertise gives you technical arguments and encryption to get repair.

fissure

 


The most common evils

 

Watertightness defects

Roof, terrace, bathroom: water infiltrates. Non-compliance with leakproof DTU.

Poor finish

Bâcle paint, irregular joints, approximate cuts, failing alignments.

Non-compliance with estimate

Different materials, dimensions not respected, services forgotten.

Isolation defects

Thermal decks, poorly laid insulation, leakproof air.

Electrical installations not in conformity

Lack of soil, poorly sized tables, standards not met.

Tiles and coatings

Irregular joints, poorly aligned earthenware, hollow tile.

Woodwork

Poorly installed windows, air infiltrations, leakproofness, difficult closure.
 

 

 

Our method

 

1. Contradictory visit (recommended)

Ideally in the presence of the contractor. We're listing the wrong lines.

2. Technical analysis

Verification of compliance with DTU, CCTV, estimate. Identification of deviations.

3. Classification of malpractices

By gravity: serious defects (seam, safety), aesthetic defects (finitions).

4. Overruns

Accurate estimate of compliance costs.

5. Report within 5 days

Opposing document with observations, photos, non-conformities, encryption.

 

 


use of the report

 

Friendly phase

The report serves as a basis for negotiation with the contractor to obtain recaptures or compensation.

 

Judicial phase

If the amicable fails, the report is a solid piece of evidence for legal action.

 

Guarantees

The report can be used to activate the guarantee of perfect completion (1 year) or the biennial guarantee (2 years).

 

 

What our customers like

Knowledge of the DTU: We know what a work conforms to

Accurate reporting: realistic cost estimate of repeats

Opposing relationship: usable in amicable or judicial phase

Independence: no link with BTP companies

 

FAQ

No. It is your right to have you attend the reception. A serious entrepreneur has nothing to fear from expertise.

Guarantee of perfect completion: 1 year. Biennial guarantee: 2 years. 10-year guarantee: 10 years (for serious disorders).

Formal notice, mediation, and legal action if necessary. Our report is a key part of the file.

 

Non-compliant work?

Make it clear before it's too late.