Independent building expert

Expertise Reception of Works

Expertise reception of works: do not sign eyes closed

The receipt of works is a major legal act: it marks the starting point for the guarantee of perfect completion and ten-year guarantees. Once the minutes have been signed, it becomes much more difficult to enforce your rights in the event of malice or non-compliance.

Yet, too many individuals and even condominiums sign without in-depth verification, pressed by the contractor or not aware of the issues. Result: forgotten reserves, undetected wrongs, protracted disputes.

Calling on an independent expert is protecting your interests and securing your investment.

fissure

 


The 3 phases where we intervene

 

1. Pre-reception (in progress)

Ideal to anticipate problems before work is completed. We check progress, compliance, finishes. Objective: Report the points to be corrected BEFORE the official reception.

2. Receipt of work (key time)

This is the critical phase. We inspect all the works, list the reserves, check for compliance with specifications and plans. The ideal is to intervene at a minimum during this stage.

3. Waiver of reservations

After making the corrections, we verify that everything has been taken up in accordance with the reservations made. Nothing should be left to chance.
 

 

 

What We Check

 

Technical conformity

Compliance with plans, specifications, specifications, specifications, applicable DTUs

Quality of execution

Finishes, alignments, sealing, insulation, structural strength

Security

Electrical installations, guardrails, evacuations, ventilation

Operation

Carpentry, shutters, equipment, heating and ventilation systems

Site cleanliness

Evacuation of rubble, surface cleaning, nearness condition

 

What our customers like

Field knowledge

We've been piloting construction sites for 8 years.

Technical rigor

We know the DTUs, the standards, the traps of the yards

OPPOSABLE REPORT

Useable in case of dispute

availability

We will be available after the report is submitted to answer your questions.

 

FAQ

Yeah, but it's risky. An uninformed eye may miss serious wrongs or accept unacceptable finishes.

No. It is your right to have you attend the reception. A serious entrepreneur has nothing to fear from expertise.

They shall be listed in the minutes of receipt. The contractor must lift them within a specified period (usually 1 month). You only pay the balance after the reserves have been lifted.

 

planned work receipt?